Gantt Chart
These chart types belong to FusionWidgets XT.
The Gantt chart is a specialized chart that you can use, to display various timelines, such as project timelines, development timelines, etc.
Basics of the Gantt chart
A Gantt chart is a date/time-based chart, with which you can plot tasks visually, with their exact start and end dates/times. You can also define milestones for the project, which assert how much of the project should be completed at a given point in time. That way, you can keep track of the project progress and plan remedial actions to bring the project back on course, if there is a delay.
A typical FusionCharts Suite XT Gantt chart looks like the following:
Click here to edit the above chart.
Features of the Gantt Chart
With a Gantt chart, you can:
Display both date and time.
Use data with multiple and irregular division of dates on the visual timeline. You can also customize the labels and cosmetic properties of the categories.
Customize input and output date formats. That way, you can provide dates in the JSON in one format and then customize the output format. Additionally, you can extensively customize the date format in the output.
Display the completion of each task in percentage, either as an empty bar or by using a different fill color (which you can define with the attribute
slackFillColor
).Show a scrollable data table at the side of the chart. You can create any number of columns in this table and display any data you want. You can also customize the cosmetics of each cell of this table.
Restrict the Gantt view pane area to a specified date/time duration. You can view the rest by scrolling the chart.
Link tasks to processes by an ID. Therefore, you can define multiple tasks for each process. This can help in cases where you plot a Gantt chart indicating allotted work for all team members, and each member has multiple jobs allotted during the same period.
Show/hide task labels, percent labels, individual task bar dates, etc.
Show individual task bars as groups – to indicate task groups.
Customize connectors to connect any two tasks on the chart. The connectors can be connected to either start or end of both the tasks and can be rendered in four different ways. You can also individually customize the cosmetics of each connector.
Display milestones at specified dates, as polygons or stars with customizable properties. You can show additional tool text for milestones as well.
Add trend-lines or trend-zones to the chart, to highlight a single date or a range of dates. For example, you can add a trend line to show "Today", or one to show a "Holiday", etc.
Customize tooltip properties. Also, you can show task date as part of the tooltip text, or use additional macros to create a dynamic tooltip.
Add a legend to the chart to show color keys, and fully customize legend cosmetics.
Set colors for the chart with pre-defined palettes and single color theme selectors.
Define the width ratio in which the data table and Gantt area are to be distributed.
Fully customize Gantt and grid cosmetics, as well as other settings, like scroll properties.
Display round-edged task bars.
Customize gradient mix and shadow effect for task bars.
Define annotations over the Gantt chart to show further information.
Enable the hovering effect, and customize hovering properties for categories, processes, connectors, and task bars.
Enable vertical scrolling.
Elements of the Gantt Chart
A Gantt chart consists of the following elements:
Categories and subcategories (dates) in the visual timeline
Scrollable data table that includes:
Process names
Additional user-defined columns of data
Scrollable Gantt view pane that includes:
Gantt task bars
Milestones
Task connectors
Trend-lines
Legend to show the color keys used in the chart
In the images given below, you can see a standard Gantt chart with a few of the above elements labeled:
Categories and subcategories (dates)
A Gantt chart has a horizontal axis representing the total time span of the project. You can break this axis down into increments (for example, days, weeks, or months). You can also define any number of sub-categories to show dates broken into smaller units. For example, if you want to show a Gantt chart spanning two years, you can show the first sub-category as quarters, then divide these quarters into months, then weeks, and finally into days.
The irregular distribution of the timeline is also possible. For example, if you want to plot a Gantt chart illustrating the development of a certain project during a time span of three months and you want to show the weekly progress, you can easily divide the time period into weeks based on their actual dates. In the visual date timeline, the bar on the top can represent the months by their names and the bar below it can display the weeks.
In most of the other Gantt charts, you are forced to divide a month into four weeks only, thereby resulting in aberrations in the visual data display, as a month is always more than 4 weeks. However, the FusionCharts Suite XT Gantt chart is date based, which means all your divisions of date are perfect. You can show a week starting in one month and ending in another.
Process Names
Each task in a Gantt chart is represented as a process. For example, in the images shown above, we have the processes "Writing", "Signing", "Financing", etc. Whenever you build a Gantt chart, you need to specify the process names and also the tasks within each process.
The process names show up in a scrollable data table to the left of the Gantt pane.
Data Table to Show Additional Data Columns
If you need to provide more data pertinent to each process, you can show that data in an interactive and fully customizable data table. This data table is draggable and scrollable. Also, each cell's cosmetics can be thoroughly customized and data in each cell can be linked to external targets.
Task Bars
Task bars are the actual bars which represent the duration of each task. They run through the horizontal length of the chart and are positioned with respect to dates specified for each of them.
Milestones
Milestones are an important part of the Gantt chart as they allow you to visually depict any crucial dates on the chart. You can create your own milestones on the chart based on the date and the tasks, i.e., for a given task you can specify milestones on specific dates. You can customize all the visual properties of the milestone including shape (star or polygon), size, and colors.
Additionally, you can add tool text and link to the milestone.
Task Connectors
You can draw connectors between the task bars to indicate the process flow.
On the functional side, to draw a connector, all you need to do is specify the Id
attributes for the two tasks that you want to connect. Apart from this, you can also specify where the connector joins the start and end task bar individually – at their start or end.
For example, if you need to plot two connecting tasks which are simultaneous in nature, that is each process starts at the same time and relates to the same thing, you can connect the start of taskbar to the start of end bar to give the visual effect. Similarly, if the second process can start only after the first process has ended, you can connect the end of the first task bar to the beginning of the succeeding taskbar.
Trend-lines
You can use trend-lines to show important dates on the chart - like today, or a scheduled date, etc.
Legend
You can define your own legend and keys for the chart. This is an optional requirement but can be useful to depict what each color represents.
Vertical Scroll Bar
A vertical scroll bar appears at the right side of the Gantt view pane in Gantt chart.
Create a simple Gantt chart
The Gantt chart is a specialized chart that you can use to monitor the progress of a project. In this section, you will see how to create a simple Gantt chart.
As an example, see how you can create a Gantt chart that monitors the various processes and tasks involved in optimizing the reach of an organization on social media.
In order to render Gantt chart, include fusioncharts.Gantt.js in the project folder with rest of the .js files, as mentioned here.
A Gantt chart that you build to track the progress of a Social Media Optimization project looks like the following:
Click here to edit the above chart.
To create a Gantt chart, you need to:
Define the data you want to plot using the Gantt chart
Define the visual timeline for the chart
Define processes
Define tasks
To create the Social Media Optimization Gantt chart, use the data given in the table below:
Process Name | Start Date | End Date | |
---|---|---|---|
Identify Customers | 08/04/2014 | 08/10/2014 | |
Survey 500 Customers | 08/08/2014 | 08/19/2014 | |
Interpret Requirements | 08/19/2014 | 09/02/2014 | |
Market Analysis | 08/24/2014 | 09/02/2014 | |
Brainstorm Concepts | 09/02/2014 | 09/21/2014 | |
Define Ad Requirements | 09/21/2014 | 10/06/2014 | |
Design & Develop | 10/06/2014 | 01/21/2015 | |
Mock Test | 01/21/2015 | 02/19/2015 | |
Documentation | 01/28/2015 | 02/24/2015 | |
Start Campaign | 02/24/2015 | 03/27/2015 |
In the above table, you can see the various processes involved, as well as and the start and end date for each of them.
The Gantt chart shown above tracks the monthly progress of each process. Each month here represents a category. Let's say you want to monitor both, the quarterly and the monthly progress. In this case, you will have to render the chart with two categories - one for the months and another for the quarters.
The Social Media Optimization Gantt chart rendered with multiple categories looks like the following:
Click here to edit the above chart.
Define and show/hide task labels
Use the following attributes to define and set the visibility of the task labels:
Set the value of the
showTaskLabels
attribute to1
, to render task labels on the chart.Set the value of the
showLabels
attribute to1
, to display task labels on the chart.Use the
label
attribute to specify the text of the label for a particular task.
Refer to the code below:
{
"chart": {
"showTaskLabels": "1"
},
"categories": [{
"category": [{
"start": "08/01/2014",
"end": "09/30/2014",
"label": "Q3"
}, {
...
}]
}, {
"category": [{
"start": "08/01/2014",
"end": "08/31/2014",
"label": "Aug '14"
}, {
...
}]
}],
"processes": {
...
"process": [{
"label": "Identify Customers"
}, {
...
}]
},
"tasks": {
"task": [{
...
}]
}
}
The chart will look as shown below:
Click here to edit the above chart.
Show/Hide Task Start and End Dates
Use the following attributes to show/hide task start and end dates:
Set the value of the
showTaskStartDate
attribute to1
, to show the task start date with the task bar.Set the value of the
showTaskEndDate
attribute to1
, to show the task end date with the task bar.Set the value of the
showStartDate
attribute to1
, to show the start date with the task bar.Set the value of the
showEndDate
attribute to1
, to show the end date with the task bar.
Refer to the code below:
{
"chart": {
"showTaskLabels": "1",
},
"categories": [{
"category": [{
...
}]
}, {
"category": [{
...
}]
}],
"processes": {
...
"process": [{
...
}]
},
"tasks": {
"task": [{
"start": "10/06/2014",
"end": "01/21/2015",
"label": "Promotion Applications",
"showStartDate": "1",
"showEndDate": "1"
}, {
...
}]
}
}
The chart will look as shown below:
Click here to edit the above chart.
Add and customize the process header
Use the following attributes used to add and customize process headers:
Set the value of the
headerText
attribute to specify the text for the header.Set the value of the
headerAlign
attribute toleft
,center
, orright
, to specify the horizontal alignment for the column header.Set the value of the
headerVAlign
attribute totop
,middle
, orbottom
, to specify the vertical alignment for the column header.Set the value of the
headerFont
to the font family of the process header.Set the value of the
headerFontSize
attribute to the font size of the process header.Set the value of the
headerFontColor
attribute to the hex code of the font color of the process header.Set the value of the
headerIsBold
attribute to1
, to apply bold formatting to the process header.Set the value of the
headerIsItalic
attribute to1
, to italicize the process header.Set the value of the
headerIsUnderline
attribute to1
, to underline the process header.
Refer to the code below:
{
"chart": {
...
},
"categories": [{
"category": [{
...
}]
}, {
"category": [{
...
}]
}],
"processes": {
"fontsize": "12",
"isbold": "1",
"align": "right",
"headerText": "What to do",
"headerFontSize": "20",
"headerVAlign": "bottom",
"headerAlign": "right",
"process": [{
...
}]
},
"tasks": {
"task": [{
...
}]
}
}
The chart will look as shown below:
Click here to edit the above chart.
Add more columns to the data table
The Social Media Optimization Gantt chart that we have been looking at so far looks like the following:
The above Gantt chart rendered with an additional "Owner" column looks like the following:
Click here to edit the above chart.
Since the chart width is relatively small here, a scroll bar comes up to help you scroll through the data table. To increase the width of the data table:
Increase the chart width.
Set the value of
GanttWidthPercent
attribute underchart
object to a lower value (between0
and100
). This attribute indicates the percent space (width) the Gantt pane takes.
You can also explicitly set the width of each data column using the width
attribute of the datacolumn
object, either as a pixel value or as a percentage of the entire data grid width.
If you wish to hide the scrollbar of the data column, you can set showFullDataTable to 0 (false) in chart object. This will wrap & truncate the data labels and try to squeeze them in the required space (only if possible).
Customize the hover effect
In a Gantt chart, the hover effect is rendered as a vertical/horizontal band when you hover the mouse pointer over a category/process header. Different ways in which you can customize the hover effect for a Gantt chart include the following.
Customize the hover effect globally
Use the following attributes to customize the hover effect globally.
Set the hover band color of the categories and processes objects in hex code, using the
hoverBandColor
attribute.Set the transparency for the hover band of the categories and processes objects between
0
(transparent) and100
(opaque), using thehoverBandAlpha
attribute.
Refer to the code below:
{
"chart": {
"hoverBandColor": "#BEFFFF",
"hoverBandAlpha": "40"
}
}
The chart will look as shown below:
Click here to edit the above chart.
Customize hover effect for processes
Customize the hover effect for processes using the following attributes:
Set the value of the
processHoverBandColor
attribute in hex code to specify the hover band color for specific processes.Set the value of the
processHoverBandAlpha
attribute between0
(transparent) and100
(opaque), to specify the transparency of the hover band color for specific processes.Set the value of the
hoverBandColor
attribute in hex code to specify the hover band color for all processes.Set the value of the
hoverBandAlpha
attribute between0
(transparent) and100
(opaque), to specify the transparency of the hover band color for all processes.
Refer to the code below:
{
"chart": {
...
},
"categories": [{
"category": [{
...
}]
}, {
"category": [{
...
}]
}],
"processes": {
"hoverBandcolor": "#AFFAEC",
"hoverBandAlpha": "30",
"process": [{
...
}]
},
"tasks": {
"task": [{
...
}]
}
}
The chart will look as shown below:
Click here to edit the above chart.
Customize hover effect for categories
Use the following attributes to customize the hover effect for categories:
Set the value of the
categoryHoverBandColor
attribute in hex code to specify the hover band color for specific categories.Set the value of the
categoryHoverBandAlpha
attribute between0
(transparent) and100
(opaque), to specify the transparency of the hover band color for specific categories.Set the value of the
hoverBandColor
attribute in hex code to specify the hover band color for all categories.Set the value of the
hoverBandAlpha
attribute between0
(transparent) and100
(opaque), to specify the transparency of the hover band color for all categories.
Refer to the code below:
{
"chart": {
...
},
"categories": [{
"hoverBandcolor": "#A1F1EF",
"hoverBandAlpha": "50",
"category": [{
...
}]
}, {
"category": [{
...
}]
}],
"processes": {
"process": [{
...
}]
},
"tasks": {
"task": [{
...
}]
}
}
The chart will look as shown below:
Click here to edit the above chart.
Disable hover effects
Use the following attributes to disable the hover effect:
Set the value of the
showHoverEffect
attribute to0
, to disable the hover effect. To disable hover effects for all categories, processes, tasks, and connectors on the chart, setshowHoverEffect
to0
with thechart
object. Similarly, to disable the hover effect for one or multiple categories/processes, use this attribute with their respective objects.Set the value of the
showHoverBand
attribute to0
, disable hover effects for color bands. Use this attribute when you want to enable hover effects for the categories and processes only and disable the hover effects for tasks and connectors.
Refer to the code below:
{
"chart": {
"showHoverEffect": "0",
"showHoverBand": "0"
}
}
The chart will look as shown below:
Click here to edit the above chart.
Configure task bars
You can customize the way task bars render on the chart in the following ways:
Indicate percent complete figures
Use the following attributes to render task bars that indicate the percentage of the project that has been completed. Note that the portion of the task that is yet to be completed is called the slack.:
Set the value of the
percentComplete
attribute between0
and100
.Set the value of the
slackFillColor
attribute to the hex code of the color used to render the slack.Set the value of the
showSlackAsFill
attribute to0
to render the slack as an empty bar.
Refer to the code below:
{
"chart": {
"slackFillColor": "#CC0000",
},
"datatable": {
...
"datacolumn": [{
...
"text": [{
...
}]
}]
},
"categories": [{
"category": [{
...
}]
}, {
"category": [{
...
}]
}],
"processes": {
...
"process": [{
...
}]
},
"tasks": {
"task": [{
"start": "10/06/2014",
"end": "01/21/2015",
"percentComplete": "20"
}, {
...
}]
}
}
The chart will look as shown below:
Click here to edit the above chart.
Customize the hover effect for tasks
Use the following attributes to customize the hover effect for tasks:
Set the value of the
taskHoverFillColor
attribute in hex code to specify the task bar fill color when you hover the mouse pointer over it. It applies to all tasks.Set the value of the
taskHoverFillAlpha
attribute between0
(transparent) and100
(opaque), to specify the transparency of the task bar fill color when you hover the mouse pointer over it. It applies to all tasks.Set the value of the
hoverFillColor
attribute in hex code to specify the hover band color for specific categories, when you hover the mouse pointer over it. Use this attribute with thetasks
object to apply the color to all tasks created using the object. Otherwise, use it with the task object, to apply the color to only one task created using the object.Set the value of the
hoverFillAlpha
attribute between0
(transparent) and100
(opaque), to specify the transparency of the hover band color for specific categories, when you hover the mouse pointer over it. Use this attribute with thetasks
object to apply the transparency to all tasks created using the object. Otherwise, use it with the task object, to apply the transparency to only one task created using the object.Set the value of the
showHoverEffect
attribute to0
, to disable the hover effect for all elements of the chart.Set the value of the
showTaskHoverEffect
attribute to0
, to disable the hover effect for all tasks of the chart.
Refer to the code below:
{
"chart": {
...
},
"datatable": {
...
"datacolumn": [{
...
"text": [{
...
}]
}]
},
"categories": [{
"category": [{
...
}]
},
{
"category": [{
...
}]
}
],
"processes": {
...
"process": [{
...
}]
},
"tasks": {
"hoverFillColor": "#F4BEFF",
"hoverFillAlpha": "80",
"task": [{
"start": "10/06/2014",
"end": "01/21/2015",
"hoverFillColor": "#1FC0FF",
"hoverFillAlpha": "80"
},
{
...
}
]
}
}
The chart will look as shown below:
Click here to edit the above chart.
Customize hover effect for slacks
Use the following attributes to customize the hover effect for slacks:
Set the value of the
slackHoverFillColor
attribute in hex code to specify the slack bar fill color when you hover the mouse pointer over it.Set the value of the
slackHoverFillAlpha
attribute between0
(transparent) and100
(opaque), to specify the transparency of the slack bar fill color when you hover the mouse pointer over it.
Refer to the code below:
{
"chart": {
...
},
"datatable": {
...
"datacolumn": [{
...
"text": [{
...
}]
}]
},
"categories": [{
"category": [{
...
}]
},
{
"category": [{
...
}]
}
],
"processes": {
...
"process": [{
...
}]
},
"tasks": {
"hoverFillColor": "#F4BEFF",
"hoverFillAlpha": "80",
"slackHoverFillColor": "#CEFF1F",
"slackHoverFillAlpha": "80",
"task": [{
"start": "10/06/2014",
"end": "01/21/2015",
"percentComplete": "20",
"slackHoverFillColor": "#F50EF1",
"slackHoverFillAlpha": "80"
},
{
...
}
]
}
}
The chart will look as shown below:
Click here to edit the above chart.
Create task bars that look like task groups
Set the value of the showAsGroup
attribute to 1
, to visually represent a task as a parent group.
Refer to the code below:
{
"chart": {
...
},
"datatable": {
...
"datacolumn": [{
...
"text": [{
...
}]
}]
},
"categories": [{
"category": [{
...
}]
},
{
"category": [{
...
}]
}
],
"processes": {
...
"process": [{
...
}]
},
"tasks": {
...
"task": [{
"start": "10/06/2014",
"end": "01/21/2015",
"showAsGroup": "1",
"label": "Production",
"showLabel": "1"
},
{
...
}
]
}
}
The chart will look as shown below:
Click here to edit the above chart.
Draw task bars with rounded corners
Set the value of the taskBarRoundRadius
attribute to render task bars with rounded corners having a specific radius (equal to the value of this attribute) for the corners.
Refer to the code below:
{
"chart": {
"taskBarRoundRadius": "6"
}
}
The chart will look as shown below:
Click here to edit the above chart.
Customize tool text for task bars
Use the following attributes to render custom tool text:
Set the value of the
dateInToolTip
attribute to1
, to render the date as part of the tooltip text.Set the value of the
plotToolText
attribute to the custom tool text for each task bar.
Refer to the code below:
{
"chart": {
"dateInToolTip": "1",
"plottooltext": "$processName{br} $label starting date $start{br}$label ending date $end",
}
}
The chart will look as shown below:
Click here to edit the above chart.
Add macros to tooltip variables
Add macros to configure dynamic and contextual content in tooltip. For instance, you can specify the tool text for milestones in the Gantt chart using the milestoneToolText
attribute. Use the following macros specifically with Gantt charts:
Specify the start time of a task using the
$start
macro.Specify the end time of a task using the
$end
macro.Specify the process name of a task using the
$processName
macro.Specify the label of a task using the
$label
macro.Specify the percentage of task completed (if provided) using the
$percentComplete
macro.Specify the milestone date using the
$date
macro.Specify the start date of the task that corresponds to a milestone using the
$taskStartDate
macro.Specify the end date of the task that corresponds to a milestone using the
$taskEndDate
macro.Specify the label of the task that corresponds to a milestone using the
$taskLabel
macro.Specify the percentage of completion (if provided) of the task that corresponds to a milestone, using the
$taskPercentComplete
macro.Specify the name of the process that corresponds to a milestone using the
$processName
macro.
Configure date formats
Using FusionCharts Suite XT, you can input the date in one format and output it using a custom format.
Set input date format
Specify the input date format for all the dates in your JSON data using the dateFormat
attribute, which can take values in any of the following formats:
mm/dd/yyyy
dd/mm/yyyy
yyyy/mm/dd
This is a mandatory attribute to specify. Once you specify it with a specific format, all dates in your JSON data must conform to that format.
Refer to the code below:
{
"chart": {
"dateFormat": "mm/dd/yyyy"
}
}
The chart will look as shown below:
Click here to edit the above chart.
Set Input Time Format
In FusionCharts Suite XT, you must specify time in the 24-hour format as "hour:mins:secs (hh:mm:ss)" in the JSON/XML data. Use the following attributes to set the input time format.
Specify the starting time for a task using the
start
attribute, which can be used with thecategory
and thetask
objects.Specify the ending time for a task using the
end
attribute, which can be used with thecategory
and thetask
objects.
Set the output date format
You can configure the output date format to be different from the input date format. Set the output date format using the outputDateFormat
attribute. You can also customize the output date format by using one or more of the predefined tokens with the outputDateFormat
attribute. The supported tokens are given below:
dd
represents date in numeric formatmm
represents month in numeric formatyy
represents year (2 digits only) in numeric formatyyyy
represents year (4 digits only) in numeric formathh
represents hour in numeric, 24-hour formathh12
represents hour in numeric, 12-hour formatmn
represents minute in numeric formatss
represents second in numeric formatampm
represents AM/PM in 12-hour formatmnl
represents long (full) month namemns
represents short (abbreviated) month namednl
represents long (full) week day namemns
represents short (abbreviated) week day nameds
represents suffix for the date (st, nd, rd, th, etc.)
Note: If you don't customize the output date format, then it will be the same as the input date format.
A few sample values along with the custom output date formats you can use to represent them are given below:
Use
ddds mnl, yyyy
format to represent dates in formats like 21st March, 2018.Use
mnl dd yyyy
format to represent dates in formats like March 21 2018.Use
mns-dd-yy
format to represent dates in formats like 21-Mar-18.Use
mm/dd/yyyy
format to represent dates in formats like 3/7/2018.Use
dd-mm
format to represent dates in formats like 21-03.Use
dnl, ddds mnl yy
format to represent dates in formats like Friday, 21st March 18.Use
dd-mm-yyyy hh:mn:ss
format to represent date and time in formats like 21-7-2018 13:11:20.Use
dd-mm-yyyy hh12:mn:ss ampm
format to represent date and time in formats like 21-7-2018 1:11:20 PM.Use
hh12:mn:ss ampm
format to represent time in formats like 1:11:20 PM.
The output format is not restricted to the examples listed above. Using the tokens, you can build your own custom date format templates.
Add scroll to chart
The Gantt chart supports scrolling for both the data table and the Gantt view pane.
Enable vertical scrolling
Vertical scrolling is enabled by default, depending on the height of your chart. If the number of processes fits within the height of the chart, vertical scrolling will not appear. You can manually enable vertical scrolling, if you want. To do so, set the value of the useVerticalScrolling
attribute to 1
.
Refer to the code below:
{
"chart": {
"useVerticalScrolling": "1"
}
}
The chart will look as shown below:
Click here to edit the above chart.
Enable scroll for the data table
The data table automatically starts to scroll when you add data columns that do not fit in the specified area of the grid. You can, however, use one of three following methods to disable the scrollbar:
Increase the chart width so that the data-grid fits completely in one screen.
Set the value of the
GanttWidthPercent
attribute to a lower value (between0
and100
) for the globalchart
object. This attribute indicates the percent space (width) the Gantt pane takes. If the Gantt takes lesser space, the grid will get more space and will fit in the full labels.Set the value of the
showFullDataTable
attribute to '0' for the chart object. This asks the chart to wrap and truncate the data labels and try to squeeze them in the required space (if possible)
Refer to the code below:
{
"chart": {
"GanttWidthPercent": "50",
"showFullDataTable": "0"
}
}
The chart will look as shown below:
Click here to edit the above chart.
Enable scrolling for the gantt pane
By default, the Gantt pane never automatically scrolls, unless you explicitly specify it. To enable scrolling for the Gantt pane, you need to decide which time frame should be visible in one screen of the Gantt pane. Once you decide and specify it for the chart, you will be able to see the rest of time frame when you scroll. Use the following attributes to customize scrolling:
Set the value of the
GanttPaneDuration
attribute to the duration you want the Gantt pane to represent at a given point.Set the value of the
GanttPaneDurationUnit
attribute to the unit of the duration you choose (such as y,m,d, h, mn, and s).
Note: You can assign any of the following values, each of which represent a different unit, to the GanttPaneDurationUnit
attribute:
Use
y
to represent the number of years to display.Use
m
to represent the number of months to display.Use
d
to represent the number of days to display.Use
h
to represent the number of hours to display.Use
mn
to represent the number of minutes to display.Use
s
to represent the number of seconds to display.
Refer to the code below:
{
"chart": {
"ganttPaneDuration": "3",
"ganttPaneDurationUnit": "m"
}
}
The chart will look as shown below:
Click here to edit the above chart.
Note: If the duration specified by you is more than the actual time span of the chart, the scroll bar for the Gantt pane is not displayed.
Configure scroll properties
Use the following attributes to configure scroll cosmetics:
Set the hex code of the color for the scrollbar using the
scrollColor
attribute.Specify the vertical padding between the scrollbar and the chart canvas using the
scrollPadding
attribute.Specify the vertical padding between the scrollbar and the chart canvas using the
scrollPadding
attribute.Specify the height of the scrollbar using the
scrollHeight
attribute.Specify the width of the scroll buttons using the
scrollBtnWidth
attribute.Specify the horizontal padding between the scroll bar and the scroll buttons using the
scrollBtnPadding
attribute.Specify whether scroll bars will be rendered as flat scroll bars using the
flatScrollBars
attribute. Set it to1
to render the scroll bars as flat bars, or set it to0
to render them with a gradient effect.
Refer to the code below:
{
"chart": {
"scrollColor": "#CCCCCC",
"scrollPadding": "4",
"scrollHeight": "20",
"scrollBtnWidth": "25",
"scrollBtnPadding": "5"
}
}
The chart will look as shown below:
Click here to edit the above chart.
If you do not find this attribute in the data do not be surprised, as this attribute is set in the theme we are using for the fiddles.
Scroll to a Specific Date
Specify the date from where the Gantt chart will initially render, using the scrollToDate
attribute. This attribute will work only when the GanttPaneDuration
and the GanttPaneDurationUnit
attributes are set as per the requirement.
Refer to the code below:
{
"chart": {
"scrollToDate": "08/24/2014"
}
}
The chart will look as shown below:
Click here to edit the above chart.
Add Multiple Tasks to a Process
You may come across scenarios, where a process comprises multiple tasks. A Gantt chart allows you to create multiple tasks for processes by mapping tasks and processes using IDs.
In this section, you will see how to add multiple tasks to a process.
Example Data to Plot: Employee Schedule
Assume that we have a Gantt chart showing the employee schedule where each employee is a process. For this chart, you might need to create multiple tasks for each employee.
For this example, let's plot a Gantt chart showing the scheduled work list for each employee during a particular week. You can visualize the data as shown in the table below. Note that all input dates are in mm/dd/yyyy hh:mm:ss format.
Employee Name | Employee Id | Team | Allotted tasks for this week |
---|---|---|---|
John.S | EMP121 | Graphics | Date: 7/21/2014 09:30:00 - 7/21/2014 17:00:00 Task: Logo-I Date: 7/22/2014 09:30:00 - 7/22/2014 16:30:00 Task: Logo-II Date: 7/23/2014 14:00:00 - 7/24/2014 16:30:00 Task: Website Template |
David.G | EMP122 | PHP | Date: 7/21/2014 10:00:00 - 7/25/2014 14:30:00 Task: PHP Blueprint |
Mary.P | EMP123 | Testing | Date: 7/21/2014 10:00:00 - 7/21/2014 15:30:00 Task: Testing Specification Date: 7/22/2014 09:30:00 - 7/22/2014 16:00:00 Task: Testing tool research Date: 7/23/2014 09:30:00 - 7/25/2014 16:30:00 Task: Testing tool integration |
Andrew.H | EMP124 | QA | Date: 7/22/2014 09:30:00 - 7/22/2014 16:30:00 Task: QA Date: 7/23/2014 09:00:00 - 7/23/2014 16:30:00 Task: QA Date: 7/24/2014 09:30:00 - 7/25/2014 14:30:00 Task: QA |
Neil.M | EMP125 | Documentation | Date: 7/25/2014 15:00:00 - 7/25/2014 16:59:00 Task: Weekly Meet |
From the above data, you can deduce that:
Each employee is a process.
Each employee is assigned a unique ID that will be used to map the tasks with the employees.
Each employee is assigned multiple tasks.
Each task is assigned a unique ID (not shown in the table above).
When you dynamically generate JSON data for the Gantt chart from your database, in all probability, you will have internal IDs defined for each task and each process. You can use those IDs as the process ID and task ID.
Convert to JSON
The above table when converted to JSON looks as under:
In the above JSON, we have:
Defined the visual timeline (categories) to show days in the fourth week of July 2014.
Defined each employee as a process and assigned the employee ID as process ID.
Added each employee's team name and an additional data column.
Defined each task with its own ID. Each task is linked to its employee using the process ID.
The chart will look as shown below:
Click here to edit the above chart.
Show Projected vs Actual Dates
You can follow the technique of allocating multiple tasks to show the projected vs actual duration for different tasks. A Gantt chart with projected and actual timelines looks like the following:
Click here to edit the above chart.
In the above chart, you can see the time required by various tasks in a construction process. The projected time required is rendered in blue and the actual time required is rendered in gray.
Add legend to projected vs actual chart
In the chart above, notice how color coding can help you distinguish between actual dates and projected dates. The labels "Planned" and "Actual" indicate which color indicates what. An even better way you can follow is to add a legend to the chart, using the following attributes:
Specify the label for the legend using the
label
attribute.Specify the hex code for the color to be used for the legend using the
color
attribute.Specify the caption for the legend box using the
legendCaption
attribute.
Refer to the code below:
{
"chart": {
...
},
"categories": [{
"category": [{
...
}]
},
{
"category": [{
...
}]
}
],
"processes": {
...
"process": [{
...
}]
},
"tasks": {
...
"task": [{
...
}]
},
"legend": {
"item": [{
"label": "Planned",
"color": "999999"
},
{
"label": "Actual",
"color": "4567aa"
}
]
}
}
The chart will look as shown below:
Click here to edit the above chart.
Create Time-based Charts
Using FusionCharts Suite XT, you can create date-based and time-based charts, as well as charts that plot both date and time.
Proper time format in Fusioncharts Suite XT
In FusionCharts Suite XT, you must specify time in the 24-hour format as "hour:mins:secs (hh:mm:ss)" in the JSON/XML data.
The 24-hour clock is a convention of time-keeping in which the day runs from midnight to midnight and is divided into 24 hours, numbered from 0 to 23. A time of the day is written in the 24-hour notation in the form hh:mm (for example 01:23) or hh:mm:ss (for example, 01:23:45), where hh (00 to 23) is the decimal number of full hours that have passed since midnight, mm (00 to 59) is the number of full minutes that have passed since the last full hour, and ss (00 to 59) is the number of seconds since the last full minute. In the 24-hour time notation, the day begins at midnight, 00:00 and the last minute of the day are that which begins at 23:59.
To specify a time in the JSON data, you need to define a category
object.
Refer to the code below:
"category": [
{
"start": "00:00:00",
"end": "23:59:59",
"label": "Day"
}
]
You can also define a task
object. Refer to the code below:
"task": {
"processid": "EMP121",
"start": "08:00:00",
"end": "12:30:00",
"label": "Morning Shift"
}
Time-based Gantt chart
As an example, let's plot a time-based Gantt chart that represents the time shifts for each employee of the development division at Bakersfield Central. The chart's time span is a single day. Within that day, let's distribute the chart into time blocks and the working hours for each employee.
The chart will look as shown below:
Click here to edit the above chart.
Note that if you're using only time-based charts, you can specify 23:59:59 as 24:00:00 for ease of usage.
Create Date+Time-based Charts
As an example here, let's plot a time-based Gantt chart to show the development division's work schedule over two days.
The chart will look as shown below:
Click here to edit the above chart.
Add milestones to a chart
You can use milestones on a Gantt chart, to visually depict crucial dates. You can create your own milestones on the chart based on dates and tasks, and customize all of their visual properties, including the shapes (star or polygon), sizes, and colors. You can also add tool text for milestones. Use the following attributes to add milestones to a Gantt chart:
Specify a date for a milestone using the
date
attribute.Specify the ID representing the task, to which a milestone is related, using the
taskId
attribute.Specify the color to be used to render a milestone using the
color
attribute.Specify the shape of a milestone using the
shape
attribute.Specify the tooltip text for a milestone, to be displayed when you hover the mouse pointer over it, using the
toolText
attribute.
Refer to the code below:
{
"chart": {
...
},
"categories": [{
"category": [{
...
}]
}],
"processes": {
...
"process": [{
...
}]
},
"tasks": {
"task": [{
...
}]
},
"milestones": {
"milestone": [{
"date": "1/21/2015",
"taskid": "7",
"color": "#f8bd19",
"shape": "star",
"tooltext": "Development Complete"
}, {
"date": "3/28/2015",
"taskid": "10",
"color": "#f8bd19",
"shape": "star",
"tooltext": "Successful Completion of Campaign"
}]
}
}
The chart will look as shown below:
Click here to edit the above chart.
In the chart above, you can see milestones added to the "Social Media Optimization" Gantt chart, to show the completion of development and the successful completion of the campaign.
Add custom milestone labels
You can add custom labels for milestones on a Gantt chart, using the attributes given below:
Specify a custom label for a specific milestone using the
label
attribute.Set the font for the label of a specific milestone, using the
font
attribute.Set the font size for the label of a specific milestone, using the
fontSize
attribute.Set the font color for the label of a specific milestone, using the
fontColor
attribute.Format the label of a specific milestone in bold, by setting the value of the
fontBold
attribute to1
.Format the label of a specific milestone in italic, by setting the value of the
fontItalic
attribute to1
.Set the font for all milestones in the chart, using the
milestoneFont
attribute.Set the font size for all milestones in the chart, using the
milestoneFontSize
attribute.Set the font color for all milestones in the chart, using the
milestoneFontSize
attribute.Format labels of all milestones in bold, by setting the value of the
milestoneFontBold
attribute to1
.Format labels of all milestones in italic, by setting the value of the
milestoneFontItalic
attribute to1
.
Refer to the code below:
{
"chart": {
...
},
"categories": [{
"category": [{
...
}]
}],
"processes": {
...
"process": [{
...
}]
},
"tasks": {
"task": [{
...
}]
},
"milestones": {
"milestone": [{
"date": "1/21/2015",
"taskid": "7",
"color": "#f8bd19",
"shape": "star",
"tooltext": "Successful Completion of Development",
"label": "Development Complete",
"color": "#587B17"
}, {
"date": "3/28/2015",
"taskid": "10",
"color": "#f8bd19",
"shape": "star",
"tooltext": "Successful Completion of Campaign",
"label": "Campaign Complete",
"color": "#4838D2"
}]
}
}
The chart will look as shown below:
Click here to edit the above chart.
Connect Tasks on Chart
You can draw connectors between any two tasks on the chart to show the process flow.
Add Connectors
To draw a connector, specify the IDs of the tasks that you want to connect and where the connector joins the start and end task bar individually - at the start or at the end. Use the following attributes to add connectors between tasks:
Specify the ID for the task from which the connector will begin, using the
fromTaskID
attribute.Specify the ID for the task at which the connector will end, using the
toTaskID
attribute.Specify whether a connector will connect the starting points of the source and destination tasks, by setting the value of the
fromTaskConnectStart
attribute to1
.Specify whether a connector will connect the ending points of the source and destination tasks, by setting the value of the
toTaskConnectStart
attribute to1
.
Refer to the code below:
{
"chart": {
...
},
"categories": [{
"category": [{
...
}]
}],
"processes": {
...
"process": [{
...
}]
},
"tasks": {
"task": [{
...
}]
},
//Adding connectors to tasks using id's
"connectors": [{
"connector": [
{
"fromtaskid": "2",
"totaskid": "3",
"color": "#008ee4",
"thickness": "2"
}, {
...
}, {
"fromtaskid": "8",
"totaskid": "9",
"fromTaskConnectStart": "1",
"color": "#008ee4",
"thickness": "2"
}
]
}]
}
The chart will look as shown below:
Click here to edit the above chart.
For our "Social Media Optimization" Gantt chart, we can connect tasks in the following ways:
Requirement interpretation can be done only after the customer survey is over.
Concept brainstorming can begin only after market analysis.
Testing/QA and documentation can begin at the same time.
Configure hover effect for the connectors
Use the following attributes to configure hover effects in a Gantt chart:
Specify whether hover effect will be enabled for the chart, by setting the value of the
showHoverEffect
attribute to `1.Specify whether mouse hover effect will be rendered on the connector lines, by setting the value of the
showConnectorHoverEffect
attribute to1
.Specify the hex code of the color the connector will have, when you hover the mouse pointer over it, using the
connectorHoverColor
attribute.Specify the transparency of the connector when you hover the mouse pointer over it (between
0
for transparent and100
for opaque), using theconnectorHoverAlpha
attribute.Specify the thickness (in pixels) of the connector when you hover the mouse pointer over it (between
0
for transparent and100
for opaque), using theconnectorHoverAlpha
attribute.
Refer to the code below:
{
"chart": {
"showHoverEffect": "1",
"showConnectorHoverEffect": "1",
"connectorHoverColor":"#5b0101",
"connectorHoverAlpha":"60",
"connectorHoverThickness":"3"
}
}
The chart will look as shown below:
Click here to edit the above chart.
Add Trend-lines
You can use trend-lines and trend-zones to represent a target value and a target range, respectively. You can add them to your Gantt chart to mark an event for a particular data. For example, you can add a trend-line to indicate "Testing Start" or a trend-zone to show the Christmas vacation period.
Create a trend-line
Use the following attributes to create a trend-line on a Gantt chart:
Specify the start date for the trend-line using the
start
attribute.Specify the label for the trend-line using the
displayValue
attribute.Specify the hex code for the color of the trend-line using the
color
attribute.Specify the thickness for the trend-line using the
thickness
attribute.Specify whether the trend-line will be rendered as a dashed line using the
dashed
attribute.
Refer to the code below:
{
"chart": {
...
},
"categories": [{
"category": [{
...
}]
}],
"processes": {
...
"process": [{
...
}]
},
"tasks": {
"task": [{
...
}]
},
"trendlines": [{
"line": [{
"start": "01/21/2015",
"displayValue": "Testing Start",
"color": "#333333",
"thickness": "2",
"dashed": "1"
}]
}]
}
The chart will look as shown below:
Click here to edit the above chart.
Create a trend-zone
Use the following attributes to create a trend-zone on a Gantt chart:
Specify whether a trend-zone will be displayed in the chart by setting the value of the
isTrendZone
attribute to1
.Specify the start date for the trend-zone using the
start
attribute.Specify the end date for the trend-zone using the
end
attribute.Specify the contents of the label for the trend-zone using the
displayValue
attribute.Specify the color of the trend-zone using the
color
attribute.Specify the transparency of the trend-zone (between
0
for transparent and100
for opaque) using thealpha
attribute.
Refer to the code below:
{
"chart": {
...
},
"categories": [{
"category": [{
...
}]
}],
"processes": {
...
"process": [{
...
}]
},
"tasks": {
"task": [{
...
}]
},
"trendlines": [{
"line": [{
"start": "12/25/2014",
"end": "12/31/2014",
"displayvalue": "Christmas Week",
"istrendzone": "1",
"alpha": "20",
"color": "#FF5904"
}]
}]
}
The chart will look as shown below:
Click here to edit the above chart.
Events in Gantt chart
You can configure the following events for Gantt charts:
The
dataPlotClick
event is fired when you click on a data plot point.The
processClick
event is fired when you click on a process.The
processRollOver
event is fired when you move the mouse pointer over a process. Note that in a Gantt chart, process element represents one process on the Gantt chart. You can show team members, projects, or a task list as a process - there's no restriction to that.The
processRollOut
event is fired when you move the mouse pointer out of a process.The
categoryClick
event is fired when you click on a category.The
categoryRollOver
event is fired when you move the mouse pointer over a category.The
categoryRollOut
event is fired when you move the mouse pointer out of a category.The
connectorClick
event is fired when you click on a connector.The
connectorRollOver
event is fired when you move the mouse pointer over a connector.The
connectorRollOut
event is fired when you move the mouse pointer out of a connector.The
milestoneClick
event is fired when you click on a connector.The
milestoneRollOver
event is fired when you move the mouse pointer over a connector.The
milestoneRollOut
event is fired when you move the mouse pointer out of a connector.
The chart will look as shown below:
{
"chart": {
"dateformat": "mm/dd/yyyy",
"caption": "Social Media Optimization",
"subcaption": "Project Plan",
"chartbottomMargin": "90",
"showLabel": "0"
},
"categories": [
{
"category": [
{
"start": "08/01/2014",
"end": "08/31/2014",
"label": "Aug '14"
},
{
"start": "09/01/2014",
"end": "09/30/2014",
"label": "Sep '14"
},
{
"start": "10/01/2014",
"end": "10/31/2014",
"label": "Oct '14"
},
{
"start": "11/01/2014",
"end": "11/30/2014",
"label": "Nov '14"
},
{
"start": "12/01/2014",
"end": "12/31/2014",
"label": "Dec '14"
},
{
"start": "01/01/2015",
"end": "01/31/2015",
"label": "Jan '15"
},
{
"start": "02/01/2015",
"end": "02/28/2015",
"label": "Feb '15"
},
{
"start": "03/01/2015",
"end": "03/31/2015",
"label": "Mar '15"
}
]
}
],
"processes": {
"fontsize": "12",
"isbold": "1",
"align": "left",
"process": [
{
"id": "PROCESS_1",
"label": "Identify Customers"
},
{
"id": "PROCESS_2",
"label": "Survey 500 Customers"
},
{
"id": "PROCESS_3",
"label": "Interpret Requirements"
},
{
"id": "PROCESS_4",
"label": "Market Analysis"
},
{
"id": "PROCESS_5",
"label": "Brainstorm concepts"
},
{
"id": "PROCESS_6",
"label": "Define Ad Requirements"
},
{
"id": "PROCESS_7",
"label": "Design And Develop"
},
{
"id": "PROCESS_8",
"label": "Mock test"
},
{
"id": "PROCESS_9",
"label": "Documentation"
},
{
"id": "PROCESS_10",
"label": "Start Campaign"
}
]
},
"tasks": {
"task": [
{
"id": "1",
"start": "08/04/2014",
"end": "08/10/2014",
"label": "test"
},
{
"id": "2",
"start": "08/08/2014",
"end": "08/19/2014"
},
{
"id": "3",
"start": "08/19/2014",
"end": "09/02/2014"
},
{
"id": "4",
"start": "08/24/2014",
"end": "09/02/2014"
},
{
"id": "5",
"start": "09/02/2014",
"end": "09/21/2014"
},
{
"id": "6",
"start": "09/21/2014",
"end": "10/06/2014"
},
{
"id": "7",
"start": "10/06/2014",
"end": "01/21/2015"
},
{
"id": "8",
"start": "01/21/2015",
"end": "02/19/2015"
},
{
"id": "9",
"start": "01/28/2015",
"end": "02/24/2015"
},
{
"id": "10",
"start": "02/24/2015",
"end": "03/27/2015"
}
]
},
"connectors": [
{
"connector": [
{
"fromtaskid": "2",
"totaskid": "3",
"color": "#008ee4",
"thickness": "2"
},
{
"fromtaskid": "4",
"totaskid": "5",
"color": "#008ee4",
"thickness": "2"
},
{
"fromtaskid": "5",
"totaskid": "6",
"color": "#008ee4",
"thickness": "2"
},
{
"fromtaskid": "6",
"totaskid": "7",
"color": "#008ee4",
"thickness": "2"
},
{
"fromtaskid": "7",
"totaskid": "8",
"color": "#008ee4",
"thickness": "2"
},
{
"fromtaskid": "9",
"totaskid": "10",
"color": "#008ee4",
"thickness": "2"
}
]
}
],
"milestones": {
"milestone": [
{
"date": "3/28/2015",
"taskid": "10",
"color": "#f8bd19",
"shape": "star",
"tooltext": "Completion of First Campaign"
}
]
},
"annotations": {
"origw": "750",
"origh": "550",
"autoscale": "1",
"groups": [
{
"id": "info",
"items": [
{
"id": "infoBg",
"type": "rectangle",
"x": "$canvasCenterX-225",
"y": "$chartEndY-15",
"tox": "$canvasCenterX+55",
"toy": "$chartEndY-90",
"fillcolor": "#CCCCCC"
},
{
"id": "infoText",
"type": "Text",
"fontSize": "11",
"fillcolor": "#333333",
"isHTML": "1",
"text": "Click on Task to get Details",
"x": "$chartCenterX",
"y": "$chartEndY-53"
}
]
}
]
}
}
<chart dateformat="mm/dd/yyyy" caption="Social Media Optimization" subcaption="Project Plan" chartbottommargin="90" showlabel="0">
<categories>
<category start="08/01/2014" end="08/31/2014" label="Aug '14" />
<category start="09/01/2014" end="09/30/2014" label="Sep '14" />
<category start="10/01/2014" end="10/31/2014" label="Oct '14" />
<category start="11/01/2014" end="11/30/2014" label="Nov '14" />
<category start="12/01/2014" end="12/31/2014" label="Dec '14" />
<category start="01/01/2015" end="01/31/2015" label="Jan '15" />
<category start="02/01/2015" end="02/28/2015" label="Feb '15" />
<category start="03/01/2015" end="03/31/2015" label="Mar '15" />
</categories>
<processes fontsize="12" isbold="1" align="left">
<process id="PROCESS_1" label="Identify Customers" />
<process id="PROCESS_2" label="Survey 500 Customers" />
<process id="PROCESS_3" label="Interpret Requirements" />
<process id="PROCESS_4" label="Market Analysis" />
<process id="PROCESS_5" label="Brainstorm concepts" />
<process id="PROCESS_6" label="Define Ad Requirements" />
<process id="PROCESS_7" label="Design And Develop" />
<process id="PROCESS_8" label="Mock test" />
<process id="PROCESS_9" label="Documentation" />
<process id="PROCESS_10" label="Start Campaign" />
</processes>
<tasks>
<task id="1" start="08/04/2014" end="08/10/2014" label="test" />
<task id="2" start="08/08/2014" end="08/19/2014" />
<task id="3" start="08/19/2014" end="09/02/2014" />
<task id="4" start="08/24/2014" end="09/02/2014" />
<task id="5" start="09/02/2014" end="09/21/2014" />
<task id="6" start="09/21/2014" end="10/06/2014" />
<task id="7" start="10/06/2014" end="01/21/2015" />
<task id="8" start="01/21/2015" end="02/19/2015" />
<task id="9" start="01/28/2015" end="02/24/2015" />
<task id="10" start="02/24/2015" end="03/27/2015" />
</tasks>
<connectors>
<connector fromtaskid="2" totaskid="3" color="#008ee4" thickness="2" />
<connector fromtaskid="4" totaskid="5" color="#008ee4" thickness="2" />
<connector fromtaskid="5" totaskid="6" color="#008ee4" thickness="2" />
<connector fromtaskid="6" totaskid="7" color="#008ee4" thickness="2" />
<connector fromtaskid="7" totaskid="8" color="#008ee4" thickness="2" />
<connector fromtaskid="9" totaskid="10" color="#008ee4" thickness="2" />
</connectors>
<milestones>
<milestone date="3/28/2015" taskid="10" color="#f8bd19" shape="star" tooltext="Completion of First Campaign" />
</milestones>
<annotations origw="750" origh="550" autoscale="1">
<annotationgroup id="info">
<annotation id="infoBg" type="rectangle" x="$canvasCenterX-225" y="$chartEndY-15" tox="$canvasCenterX+55" toy="$chartEndY-90" fillcolor="#CCCCCC" />
<annotation id="infoText" type="Text" fontsize="11" fillcolor="#333333" ishtml="1" text="Click on Task to get Details" x="$chartCenterX" y="$chartEndY-53" />
</annotationgroup>
</annotations>
</chart>
<html>
<head>
<title>My first chart using FusionCharts Suite XT</title>
<script type="text/javascript" src="https://cdn.fusioncharts.com/fusioncharts/latest/fusioncharts.js"></script>
<script type="text/javascript" src="https://cdn.fusioncharts.com/fusioncharts/latest/themes/fusioncharts.theme.fusion.js"></script>
<script type="text/javascript">
FusionCharts.ready(function(){
var chartObj = new FusionCharts({
type: 'gantt',
renderAt: 'chart-container',
width: '100%',
height: '530',
dataFormat: 'json',
dataSource: {
"chart": {
"dateformat": "mm/dd/yyyy",
"caption": "Social Media Optimization",
"subcaption": "Project Plan",
"chartbottomMargin": "90",
"showLabel": "0"
},
"categories": [{
"category": [{
"start": "08/01/2014",
"end": "08/31/2014",
"label": "Aug '14"
}, {
"start": "09/01/2014",
"end": "09/30/2014",
"label": "Sep '14"
}, {
"start": "10/01/2014",
"end": "10/31/2014",
"label": "Oct '14"
}, {
"start": "11/01/2014",
"end": "11/30/2014",
"label": "Nov '14"
}, {
"start": "12/01/2014",
"end": "12/31/2014",
"label": "Dec '14"
}, {
"start": "01/01/2015",
"end": "01/31/2015",
"label": "Jan '15"
}, {
"start": "02/01/2015",
"end": "02/28/2015",
"label": "Feb '15"
}, {
"start": "03/01/2015",
"end": "03/31/2015",
"label": "Mar '15"
}]
}],
"processes": {
"fontsize": "12",
"isbold": "1",
"align": "left",
"process": [{
"id": "PROCESS_1",
"label": "Identify Customers"
}, {
"id": "PROCESS_2",
"label": "Survey 500 Customers"
}, {
"id": "PROCESS_3",
"label": "Interpret Requirements"
}, {
"id": "PROCESS_4",
"label": "Market Analysis"
}, {
"id": "PROCESS_5",
"label": "Brainstorm concepts"
}, {
"id": "PROCESS_6",
"label": "Define Ad Requirements"
}, {
"id": "PROCESS_7",
"label": "Design And Develop"
}, {
"id": "PROCESS_8",
"label": "Mock test"
}, {
"id": "PROCESS_9",
"label": "Documentation"
}, {
"id": "PROCESS_10",
"label": "Start Campaign"
}]
},
"tasks": {
"task": [{
"id": "1",
"start": "08/04/2014",
"end": "08/10/2014",
"label": "test"
}, {
"id": "2",
"start": "08/08/2014",
"end": "08/19/2014"
}, {
"id": "3",
"start": "08/19/2014",
"end": "09/02/2014"
}, {
"id": "4",
"start": "08/24/2014",
"end": "09/02/2014"
}, {
"id": "5",
"start": "09/02/2014",
"end": "09/21/2014"
}, {
"id": "6",
"start": "09/21/2014",
"end": "10/06/2014"
}, {
"id": "7",
"start": "10/06/2014",
"end": "01/21/2015"
}, {
"id": "8",
"start": "01/21/2015",
"end": "02/19/2015"
}, {
"id": "9",
"start": "01/28/2015",
"end": "02/24/2015"
}, {
"id": "10",
"start": "02/24/2015",
"end": "03/27/2015"
}]
},
"connectors": [{
"connector": [
{
"fromtaskid": "2",
"totaskid": "3",
"color": "#008ee4",
"thickness": "2"
}, {
"fromtaskid": "4",
"totaskid": "5",
"color": "#008ee4",
"thickness": "2"
}, {
"fromtaskid": "5",
"totaskid": "6",
"color": "#008ee4",
"thickness": "2"
}, {
"fromtaskid": "6",
"totaskid": "7",
"color": "#008ee4",
"thickness": "2"
}, {
"fromtaskid": "7",
"totaskid": "8",
"color": "#008ee4",
"thickness": "2"
}, {
"fromtaskid": "9",
"totaskid": "10",
"color": "#008ee4",
"thickness": "2"
}
]
}],
"milestones": {
"milestone": [{
"date": "3/28/2015",
"taskid": "10",
"color": "#f8bd19",
"shape": "star",
"tooltext": "Completion of First Campaign"
}
]
},
"annotations": {
"origw": "750",
"origh": "550",
"autoscale": "1",
"groups": [{
"id": "info",
"items": [{
"id": "infoBg",
"type": "rectangle",
"x": "$canvasCenterX-225",
"y": "$chartEndY-15",
"tox": "$canvasCenterX+55",
"toy": "$chartEndY-90",
"fillcolor": "#CCCCCC"
}, {
"id": "infoText",
"type": "Text",
"fontSize": "11",
"fillcolor": "#333333",
"isHTML": "1",
"text": "Click on Task to get Details",
"x": "$chartCenterX",
"y": "$chartEndY-53"
}]
}]
}
},
"events": {
//Using dataplot click event
"dataplotClick": function(evtObj, argObj) {
//Function to get total number of days between two dates
var getNumOfDays = function(startDt, endDate) {
var oneDay = 24 * 60 * 60 * 1000, // hours*minutes*seconds*milliseconds
firstDate = new Date(startDt),
secondDate = new Date(endDate),
diffDays = Math.round(Math.abs((firstDate.getTime() - secondDate.getTime()) / (oneDay)));
return diffDays;
},
//Function to get total days involved in project and its start date
getDaysTimeInvolved = function(dataArray) {
var startDate = new Date(dataArray[0].start),
endDate = new Date(dataArray[0].end),
currStartDate, currEndDate, totalDays;
for (var j = 0; j < dataArray.length; j++) {
currStartDate = new Date(dataArray[j].start);
currEndDate = new Date(dataArray[j].end);
(currStartDate.getTime() < startDate.getTime()) ? startDate = currStartDate : "";
(currEndDate.getTime() > endDate.getTime()) ? endDate = currEndDate : "";
}
//Get number of days between two dates
totalDays = getNumOfDays(startDate, endDate);
//Returning total number of days involved and the start date
return [totalDays, startDate];
},
//Storing the data source object
dataSource = evtObj.sender.args.dataSource && evtObj.sender.args.dataSource,
annotations = evtObj.sender.annotations && evtObj.sender.annotations,
//Get the task start date
taskStartDate = argObj.start,
//Get the task end date
taskEndDate = argObj.end,
//Total number of days involved in the task
noOfDays = getNumOfDays(taskStartDate, taskEndDate),
//Get the number of days of the project and its start date
daysTimeArr = getDaysTimeInvolved(dataSource.categories[0].category),
//Get after how many days task starts after project initialization
workStartTime = getNumOfDays(daysTimeArr[1], taskStartDate),
//Calculate percentage time required by the task w.r.t project
percentTime = Math.round(noOfDays * 100 / daysTimeArr[0]),
processId = argObj.processId.split("_"),
taskId = argObj.taskId,
processName = dataSource.processes.process && dataSource.processes.process[processId[4]].label,
infoText = "Process Name : " + processName +
"{br}Project Effort Contribution : " + percentTime + "%" +
"{br}Day of start: " + workStartTime + "th day" +
"{br}Task Duration : " + noOfDays + " days";
annotations && annotations.update('infoText', {
"text": infoText
});
}
}
}
);
chartObj.render();
});
</script>
</head>
<body>
<div id="chart-container">FusionCharts XT will load here!</div>
</body>
</html>
Click here to edit the above chart.